Friday, July 26, 2013
Thank you, Craigslist!
Last night DairyStateMom, DairyStateKid-M, and I hauled home four slabs of 4x8 by 2 inch DOW Styrofoam XPS insulation board. I bought the material at a substantial discount from a guy who had it leftover from a siding job on his home. (The seller kindly helped make it easier to haul in our small vehicles by slicing it into smaller pieces under my direction, reflecting how it would be cut up for the layout.)
I'd been looking for a few weeks for a cheaper source of this stuff, the favored scenery and roadbed material for layouts. Now I have enough for the entire layout. I may need to get a bit more either half-inch, three-quarter-inch, or one-inch thick, but even of that I have some other leftover stuff courtesy of a friend.
The final benchwork section is about two-thirds finished. When it's all together -- this weekend, perhaps? -- I'll post pictures.
Now it's time for me to return to the track plan details. Of course it would have made sense to firmly work out the track plan before even building benchwork, but as I have reported previously, the benchwork was originally constructed with a completely different configuration in mind and only repurposed when I concluded I could do a lot better than the first configuration.
As for the track plan itself, I have compiled a ton of different plans from which I can draw particular concepts for the new configuration. I have a clear idea conceptually for the plan now, but precise elements remain to be developed.
If I don't have the plan finished by about mid-August, I plan to take my drawing supplies on a vacation and hope that by my return, those details will be sufficiently finalized to enable me to start putting down cork roadbed and track -- maybe even by Labor Day weekend!
I'd been looking for a few weeks for a cheaper source of this stuff, the favored scenery and roadbed material for layouts. Now I have enough for the entire layout. I may need to get a bit more either half-inch, three-quarter-inch, or one-inch thick, but even of that I have some other leftover stuff courtesy of a friend.
The final benchwork section is about two-thirds finished. When it's all together -- this weekend, perhaps? -- I'll post pictures.
Now it's time for me to return to the track plan details. Of course it would have made sense to firmly work out the track plan before even building benchwork, but as I have reported previously, the benchwork was originally constructed with a completely different configuration in mind and only repurposed when I concluded I could do a lot better than the first configuration.
As for the track plan itself, I have compiled a ton of different plans from which I can draw particular concepts for the new configuration. I have a clear idea conceptually for the plan now, but precise elements remain to be developed.
If I don't have the plan finished by about mid-August, I plan to take my drawing supplies on a vacation and hope that by my return, those details will be sufficiently finalized to enable me to start putting down cork roadbed and track -- maybe even by Labor Day weekend!
Labels:
benchwork,
general progress,
track planning
Saturday, July 13, 2013
Never finished...
It's supposed to be the model railroad that's never finished.
But the benchwork?
A couple of weeks ago, I assembled a supplemental section to complete the circuit and allow for continuous running. The added section was built fairly quickly, and used a much more basic approach: essentially, a flat 5/8-inch thick plywood piece with legs. It was further divided into two sections, so that one could be a lift-out.
When I was finished, though, I wasn't satisfied. Then I finally let myself see another possibility that I had been resisting for the four original sections: To move the other section A from the right side of the configuration to the bottom, and put a new section along the right side. Because that is the side open to the rest of the room (see the configuration situated in the overall room in this post), that's really what made the most sense for access. See the image just above at right.
Note, too, a couple of very small additions where the main sections have to be offset so that the configuration works properly and that there is overall enough clearance in the room. Those will be very basic, just bolted to the existing sections and needing no major support.
Of course, that changed the dimensions for the new section, which gave me a justification for starting over on it. So the original added section has been put aside (I will probably cannibalize some of the lumber). In its place, I am building a full-fledged section, to be supplemented by a small lift-out to allow easy access to the center:
The principal new section will be 18 inches wide. It will be framed differently than the other four. Those used a modified form of Jim Hediger's popular and very successful ripped-plywood framework, with bolted legs. The new section will be ripped plywood framing, the pieces will be smaller and lighter, and the support will be a simple L-girder system. I've been reading, and re-reading, about this in 102 Realistic Track Plans from several years back, and wishing I had followed my initial instincts to use that system from the start.
So once again, the next step -- putting down a layer of insulation foam -- is being put off...
But the benchwork?
A couple of weeks ago, I assembled a supplemental section to complete the circuit and allow for continuous running. The added section was built fairly quickly, and used a much more basic approach: essentially, a flat 5/8-inch thick plywood piece with legs. It was further divided into two sections, so that one could be a lift-out.
Note, too, a couple of very small additions where the main sections have to be offset so that the configuration works properly and that there is overall enough clearance in the room. Those will be very basic, just bolted to the existing sections and needing no major support.
Of course, that changed the dimensions for the new section, which gave me a justification for starting over on it. So the original added section has been put aside (I will probably cannibalize some of the lumber). In its place, I am building a full-fledged section, to be supplemented by a small lift-out to allow easy access to the center:
The principal new section will be 18 inches wide. It will be framed differently than the other four. Those used a modified form of Jim Hediger's popular and very successful ripped-plywood framework, with bolted legs. The new section will be ripped plywood framing, the pieces will be smaller and lighter, and the support will be a simple L-girder system. I've been reading, and re-reading, about this in 102 Realistic Track Plans from several years back, and wishing I had followed my initial instincts to use that system from the start.
So once again, the next step -- putting down a layer of insulation foam -- is being put off...
Friday, June 28, 2013
What!??!!?!?!
I will be the first to admit, I am no expert carpenter. But still...
As previously reported, I have rearranged the layout sections I built previously into a new configuration for which I am designing a new track plan. In order to arrange continuous running, I am building another section (using somewhat different methods -- more on that later) that will turn the upside-down-U-shaped arrangement of existing sections into an O. (The unlabeled section across the bottom represents the new section.)
Going clockwise starting with the A section at the left in the above image, I have gone around leveling each section and making sure it connects smoothly with its mate. Then, as each section is leveled, it is bolted to the previous section. In this manner I have leveled and attached left-hand A to left-hand B, then left-B to right-hand B. All is well...
So what remains is right-hand A to be leveled and bolted to right-hand B, then the new section to be completed and everything bolted together. (A portion of the new section will be a lift-out to avoid having to duck under.)
In theory, the two A sections should be parallel, with an identical distance between them at either end.
In reality . . .
. . . they are 1/2-inch farther apart at the bottom (in the above image) than at the top!
How did that happen?
I did my best to keep everything square as I was assembling things. But obviously, I didn't quite succeed.
I will have to make up the difference by tweaking the final section, and specifically, I think, the lift-out portion. I will probably do that by adding some filler (in the form of a piece of scrap lumber) to the appropriate place on the lift out (or, maybe, on the part of the final section that is fixed and does not lift out).
Still, it drives me nuts that this has happened, and it's slightly depressing.
I do have, though, one consolation . . . or maybe, this one . . .
Sunday, June 23, 2013
Step by step
So, I'm working on some details.
The layout will include one new section, already sketched in to the benchwork plans: To allow continuous running, I am adding a 1-foot wide shelf unit at the bottom of the benchwork arrangement. For several weeks now I have been working on engineering that section. I have finally worked out most of the structural details, including making part of it use an elaborate lift out segment. Although this part is just the equivalent of a shelf, the benchwork is complicated for that reason. But the project is coming along, and I hope to share details sometime....