Tuesday, June 22, 2010

Shameless self-promotion

A while back I mentioned that I was writing an article about model railroading.

Well, now it's up.

Sunday, June 13, 2010

We've got wood

Finally made that trip to Home Despot today and purchases all of the framing lumber for my layout.

I'm using a slightly different approach than I last wrote about here, thanks to advice from my friend Keith. I'm still using ripped plywood instead of dimensional lumber. The siderails will be just 1/4 inch thick plywood. Cross joists will be 3/4 inch plywood, nailed and glued to the siderails. This is the same system Keith and a group of N-scale modelers use for a system of modules they're making. The frame is then topped with a 1/4 plywood slab. On top of that (and this is different from the aforementioned module system) will be 2-inch-thick insulation foam -- in this aspect, adapted from MR's Beer Line layout approach.

I got a lot of the lumber ripped at Home Despot, but for final trimming, I'm turning to a friend who has a radial arm saw and a table saw to get pieces to their final, finished size. That happens this week.

Tuesday, May 18, 2010

What's in a Name, or, Location, location, location

When I first began planning for my own model railroad as a teenager, I was captivated by the Great Northern's mountain goat logo. In those days (the end of the 1960s and the early 1970s) there wasn't a lot of prototype modeling going on yet. The typical model railroad was freelanced, even if it might be heavily influenced by or even based on a particular real-life line. So I didn't try to research the Great Northern and adopt it as my model -- I just figured out a way to rip off the logo, sort of.

Instead of the GN's rocky mountain goat, I opted for a western bighorn sheep. Then I decided to call it the Bighorn Central. (The Pennsy and the NY Central were just merging at the time, so "Central" in a railroad name seemed timely.)

Perusing maps of the west, I discovered that there really is a Bighorn Mountain Range in north central Wyoming. Without much contemplation I settled on that as the setting for my railroad. I conceived of a basic route for it across the range, although connecting imaginary communities rather than real ones.

Within a couple of years I saw a lot of flaws in my concept. Still attached to this mountainous area of Wyoming (or to my imagination of it), I discovered that there was another mountain range to the west of the Bighorns: The Bridger Range. I modified my imaginary railroad some and the fictional prototype became the Bridger Range and Northern. That was the concept I was building when I was working on the layout that I wrote about here.

Before much track had been laid, that layout came down and instead I began developing a simple shelf layout -- 8 feet by about 18 inches or so. The plans was just for a station scene, siding and a few spurs.

And for some reason -- I don't recall why -- I had abandoned the entire Bridger Range & Northern scheme. Instead, this was to be called the Cedar Creek & Western. I think I even played with a logo idea in which the C, C, and W all interlocked in such a way as to resemble the wheelset of a freight car (the truck).

I don't recall having decided where that was set, but it probably was also intended to be a western themed railroad. And set back in the first third of the 20th century --smaller equipment and all that.

In the time since then, when I've contemplated building layouts, I haven't given any thought to a name. I have contemplated location, however.

Generally I've been imagining northern Wisconsin, suitable for logging and some kind of mining operation. (Ore, probably not coal.) Now that I've finally got a track plan, I'm trying to nail that down a bit more. But I'm not quite ready to firmly commit yet, and I don't think I have to either. Still, Wisconsin, since I live here now, is pretty close to a certainty. Maybe an imaginary prototype, maybe a real one. Maybe some amalgam of the two.

But it's time, again, to think about a name. Cedar Creek & Western appeals. So does Cedar Creek & Northern. I may look over specific locations I want to include and arrive at another name. And I've been perusing books on Wisconsin railroading for other ideas, too.

Then, finally, there's time period. All along I've though I'd make it in the teens, 20s or early 30s. Maybe even in the first decade of the 20th century.

Lately, I'm rethinking that, too. The expanded possibilities for setting it in, say, the '40s and early '50s -- still lots of steam in use, but also making it possible to employ some older diesels (cheaper to buy) -- intrigue me. Again, I don't have to commit quite yet, not until I'm actually investing in rolling stock. Yet another alternative is to model multiple periods -- run 50s rolling stock one day, 'teens rolling stock another.

One time I won't do: the '20s. I want to have a brewery somewhere on the layout. And it's no fun if they can't brew real beer.

Sunday, May 16, 2010

Measure twice, cut once.

I was panicking a bit this week, trying to make detailed plans from drawings of the track plan I am using for my layout. Somehow my drawings just didn't match up with the original, no matter how hard I tried.

Then I looked more closely and saw that I was working from a width that was 6 inches too short, in two different spots.

Once I realized that, it all made a lot more sense. So I've now worked up the benchwork plan. The layout will be in 4 sections: Two that measure 2 feet by 6 feet-9 inches, and two measuring 3 feet by 4 feet.

I plan to get all the framing from 3-inch strips ripped from a single 4 x 8 x 1/2 inch sheet of birch plywood, using a combination of Jim Hediger's plywood frame in Basic Model Railroad Benchwork and the benchwork design that David Popp came up with for the Beer Line sectional layout. I will use self-leveling feet rather than casters. While the framework will be assembled with glue and nails, the legs will be bolted to the frame/table assembly. Angle braces and I-bar shaped lower cross braces also will be bolted in place. The point is to allow for easy moving of the finished layout to a new location as the opportunity and need arise.

The table tops will be 1/4-inch plywood topped with 2-inch insulation foam.

I'll make L-shaped legs, also from ripped plywood. The remaining as yet unsettled question is, how high do I want it? As I explained to DairyStateMom this evening, it's a matter of finding the height that optimizes ease of work with interest of angle in viewing.

But I will give myself some time on that question, and I won't buy the leg lumber in all likelihood until I have actually built the table tops themselves.

Sunday, May 9, 2010

Still more on track

Wow, do I feel like a newbie...

I dropped in to browse at one of the larger hobby shops in our area yesterday -- my first visit in a very long time, and first ever in their new (to me) location. And I took a look at the Atlas Code 83 flex track. I had no idea...

Boy, this is not your father's Atlas.

The subject came up because I have a very cheaply purchased IHC 040 switcher boxed away with flanges that well exceed the RP-25 standard. I asked the guy in the RR dept of the store about replacement drivers or grinding them down. He's who steered me to the Code 83.

And the price, at under $5 per 3-foot section if bought in lots of 10 or more, is very appealing to my Inner Scotsman. At $1.66 a foot (less than that actually) it's a lot cheaper than the Shinohara and notably cheaper than the ME track, too.

I don't think I'll use CV hand-laid track after all.

I might try a hand-laid CV turnout, though. I see by the Walthers catalog they're about 1/2 the price of a standard turnout by any of the Mfrs, including Atlas. I'd be willing to try one.

So I'm not 100% sure if I'm ready to abandon Code 70 track entirely. (As the store guy pointed out, I could use it on spurs and sidings, which would be prototypical.) But the temptation to go to Code 83 is definitely there.

Friday, May 7, 2010

Fascinating and Creepy

Google's ads, that is.

Google has figured out I'm into model railroads. No surprise there.

So at the top of my Gmail in-box is an ad that says:
"Model Railroad - TheFutureNeedsUs.com - The Crescent Corridor Means More Jobs & Cleaner Air. Learn More."


Here's where it leads: an ad for the Norfolk Southern Ry. The real-life one, not a model.

(Crossposted at DairyStateDad)

Monday, May 3, 2010

A follow-up note on track

A little further investigation led me to the Micro Engineering product line of track. Based on Walthers' prices, it's about $1.80-$1.90 a foot or so. A lot cheaper than Shinohara's $2.33/foot.

On the other hand, CV tie strip is $.84/foot, and they sell rail to go with it at $.25/foot. So that's $1.09/foot altogether, just 60 percent -- or less -- of Micro Engineering's product. (If I buy ME rail, it's $.60/foot, for a total of $1.44/foot for the CV handlaid.)

I'm just not sure whether I'm up to the additional challenge of hand laying, although the CV tie strip does seem to be a lot easier than the old spike-it-yourself approach.

Well, I do have time to sort that out. CV sells a sample pack, and I am likely to try that out. I might do it on a separate board (my friend Keith has a "posing board" he takes outside and gets amazing pictures with). Meanwhile, I'll use the Shinohara track I already have mostly in hidden areas, I think.